Vinyl sheet flooring can be installed over almost any clean dry surface including concrete and existing flooring.
How to install vinyl sheet flooring on concrete.
Allow the new vinyl floor to acclimate to the room by leaving it in the room where it ll be installed for at least 24 hours prior to cutting.
Also it is important to take time and prepare well before you start assembling.
If there are bumps of glue popped up nails or uneven bits of concrete on the subfloor the vinyl will flow over the spot and create a slighty elevated area.
Installation for planks is easier for beginners than laying down sheet vinyl because you re working with small pieces and if you make a bad cut you can simply cut a new piece.
Even though it s n.
After 72 hours try to pull up the vinyl.
Although the flooring comes in a variety of forms planks are installable with a minimal amount of tools and measuring.
If you have questions about the current subfloor check with the sheet vinyl flooring manufacturer or retailer for specific installation instructions.
The steps in this guide on how to install vinyl plank flooring on concrete are quite easy to follow.
Like other forms of vinyl the material is resilient it springs back when you push on it and conforms to the surface on which you install it.
See how easy it is to install vinyl flooring.
Piece of vinyl flooring and taping the edges.
If you don t have all the tools or you want to be 100 sure you don t waste any material invite a friend over to help you.
Vinyl flooring is very durable and fits over most surfaces including concrete.
The hardest part of the job is often cleaning and leveling the concrete base.
Our homefit service will no longer be available from the 9 july 2018.
Vinyl flooring is sold in 6 foot and 12 foot widths making it possible to install a seamless floor in smaller rooms such as bathrooms halls and kitchens.
Vinyl planks which are often categorized as luxury vinyl are wide strips of flooring that snap together to create a continuous layer that floats over the concrete.
Any existing orders will be honoured until 14 december 2018.
After the concrete base is ready lock the vinyl planks together to.